Sundance Water Reclamation Facility

Town of Buckeye, AZ

3.5 MGD, 7.8 MGD (ultimate capacity)

Design, Build, Operate

About the project

PERC Water provided Design/Build/Operate services for a Water Reclamation Facility (WRF) for the Sundance residential master-planned community located in Buckeye, Arizona. PERC Water’s unique Customized Design Report (CDR™) approach allowed the owner to obtain a guaranteed fixed capital cost, guaranteed operating cost and a guaranteed delivery schedule based on a conceptual design at a very early stage of the project. Phase I was completed in 2002 with a 1.2 MGD capacity. PERC Water completed the Phase II expansion to 3.5 MGD in 2009.

The Phase II WRF PERC Water ASP® designed facility utilized hybrid sequential batch reactor (SBR) activated sludge process for biological oxidation of organic matter and nutrient removal. It was designed, built and operated by PERC Water for the City of Buckeye. The WRF’s has a unique design whereby all treatment of wastewater occurs in underground concrete tanks that are covered with 8,000 square feet of operations buildings constructed above.

PERC Water’s scope of service included all aspects of the operation and maintenance for the WRF to include all labor required to operate and maintain the facility, process control and regulatory compliance, sample analysis and certified laboratory services, facility maintenance and repair, chemical and power consumption and preparation of a capital improvement plan and budget.

PERC Water’s Asset Management Division provided operations and maintenance for the Sundance WRF for a 9-year period before training City staff to take over operations.


Interested in this project?

Let’s explore how we can work together.

All Projects

By Market

By Location

By Contract Type

  • , ,

    Palm Valley

    During the conceptual design stage of the Palm Valley Water Reclamation Facility (WRF) project, PERC Water provided SunCor Development and Litchfield Park Service Company (LPSCo) Utilities with a guaranteed water quality, cost, and construction schedule. Phase I was completed with a 4.1 MGD capacity to treat the wastewater to AZ Title 18 Class A+ effluent. Read More

  • SPA 2 Water Recycling Facility

    In 2006, the Arizona housing market growth was at historic growth levels and Lennar (Developer) was required by the City of Surprise, Arizona (City), to deliver a fully compliant AZ Title 18 Class A+ wastewater treatment facility as part of their agreement to develop their Asante project. Read More

  • SPA 3 Water Recycling Facility

    The Integrated Water Master Plan for Water Infrastructure for the City of Surprise, AZ (City) dated July 2009 outlined one through six management basins identified as Surprise Planning Areas (SPA). PERC Water completed four Customized Design Reports (CDR™) with four different developer groups in SPA 2, 3, 4 and 5 to design Read More