SPA 2 Water Recycling Facility

Surprise, AZ

1.2 MGD (Phase I)

CDR™, Design, Build, Operate

About the project

In 2006, the Arizona housing market growth was at historic growth levels and Lennar (Developer) was required by the City of Surprise, Arizona (City), to deliver a fully compliant AZ Title 18 Class A+ wastewater treatment facility as part of their agreement to develop their Asante project. First, the Developer hired PERC Water to complete a Customized Design Report (CDR™) which became part of the Joint Development Agreement (JDA) between the City and Developer and the basis for a design/build/operate contract between the developer and PERC Water.

The CDR™ essentially became the foundation of a quasi-Public-Private-Partnership (P3) between the City, Developer and PERC Water to deliver the infrastructure asset. Lennar contracted directly with PERC Water to design, permit and construct the new greenfield regional Water Reclamation Facility (WRF) for their Asante Master Planned Community based on the logical evolution of the SPA 2 WRF CDR™. The CDR™ outlined all of the details pertaining to the specifics of the regional SPA 2 WRF.

Phase I was completed in August 2007, and has the treatment capacity to treat up to 1.2 MGD or approximately 6,000 homes. The SPA 2 WRF is expandable up to 10.5 MGD within the existing land allocation and based on the facility masterplan completed in 2006. The SPA 2 WRF also includes professional offices, a lab, conference room, and shop for the operations.

PERC Water’s Asset Management Division has been managing the operations and maintenance of the SPA 2 WRF for the past 12 years.


Interested in this project?

Let’s explore how we can work together.

All Projects

By Market

By Location

By Contract Type

  • , ,

    Palm Valley

    During the conceptual design stage of the Palm Valley Water Reclamation Facility (WRF) project, PERC Water provided SunCor Development and Litchfield Park Service Company (LPSCo) Utilities with a guaranteed water quality, cost, and construction schedule. Phase I was completed with a 4.1 MGD capacity to treat the wastewater to AZ Title 18 Class A+ effluent. Read More

  • SPA 3 Water Recycling Facility

    The Integrated Water Master Plan for Water Infrastructure for the City of Surprise, AZ (City) dated July 2009 outlined one through six management basins identified as Surprise Planning Areas (SPA). PERC Water completed four Customized Design Reports (CDR™) with four different developer groups in SPA 2, 3, 4 and 5 to design Read More

  • ,

    Sundance Water Reclamation Facility

    PERC Water provided Design/Build/Operate services for a Water Reclamation Facility (WRF) for the Sundance residential master-planned community located in Buckeye, Arizona. Read More

Work With Us