North Side Water Works Plant – Grand Cayman
This plant was the fourth facility, designed, built and operated by Ocean Conversion (Cayman) Limited for the Water Authority-Cayman and…
Britannia Plant – Grand Cayman
Location: Seven Mile Beach, Grand Cayman Capacity: 715,000 US gallons per day (2,700 m3 per day) Contract type: Design, Build,…
North Sound Plant – Grand Cayman
Location: George Town, Grand Cayman Capacity: 1.6 million US gallons per day (6,000 m3 per day) Contract type: Design, Build,…
Lower Valley Plant – Grand Cayman
Location: Lower Valley, Grand Cayman Capacity: 1.056 million US gallons per day (4,000 m3 per day) Contract type: Design, Build,…
West Bay Plant – Grand Cayman
Location: West Bay, Grand Cayman Capacity: 910,000 US gallons per day (3400 m3 per day) Contract type: Design, Build, Own,…
Abel Castillo Water Works Plant – Grand Cayman
Location: Governors Harbour, Grand Cayman Capacity: Original facility 1.2 million US gallons per day (4,500 m3 per day) Additional facility…
Red Gate Plant – Grand Cayman
Location: George Town, Grand Cayman Capacity: 1.3 million US gallons per day (5,000 m3 per day) Contract type: Design, Build,…
Plant Information
Calendar
M | T | W | T | F | S | S |
---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | |||
5 | 6 | 7 | 8 | 9 | 10 | 11 |
12 | 13 | 14 | 15 | 16 | 17 | 18 |
19 | 20 | 21 | 22 | 23 | 24 | 25 |
26 | 27 | 28 | 29 | 30 |